WITH MEMBRANE SEPARATION TECHNOLOGY We developed and finalized a treatment plant for the production of drinking water under the concept of TURNKEY provision for the mining industry.
The modular treatment plant was conceived in 4 stages, achieving the required objectives and obtaining the best qualifications in the field. These were achieved thanks to the dedication of the highly trained personnel who supervised and conducted the work.
The team that remained in the field during the 10 months of installation and commissioning of the plant, was made up of: an Environmental Engineer, a Quality Engineer, a Safety Engineer, a Community Relations Specialist, two Engineers Water Plant Specialists and a staff of 50 qualified operators.
The work was carried out in a limited time, at 4100 mts. above sea level, with the highest safety, quality and environmental care requirements required by the mining industry.
The agreement with our client (one of the most important mining companies in the world) also contemplates the operation of the equipment for a period of 3 years.
Therefore, for this activity we assigned an operation and maintenance team that will be responsible for delivering drinking water to the mining camp, which will have a population of 6,000 inhabitants.
In turn, the water plant, through an online management system designed by our Systems department, can be monitored from our Central Plant, which allows us to instantly detect any deviation, such as variations in the characteristics of the feeding water.
Custom solutions.
The design and choice of the appropriate treatment to apply are specific for each client, since it depends on several factors, such as: the water to be treated, the physical space, the required water quality, etc.
Remote control.
The management software, designed by the Systems Department, allows to instantly provide information on the operating parameters of the plant and prevent possible failures that may occur.